An Installation Guide for Industrial Piping
The following data outlines necessary information for installing Golan brass saddles, Krausz stainless steel saddles, and electrofusion saddles to Pexgol (PE-Xa) pipes.
Important: Install all saddles onto their pipes before drilling the outlet holes.
Brass saddles — Dimensions of drills for outlet holes:

Notes:
- For saddles up to 63 mm — use a 11 mm wrench
- For saddles 75 mm and 90 mm — use a 14 mm wrench
- Tighten saddles until the two halves touch
Stainless steel saddles — Dimensions of drills for outlet holes:
Follow specific manufacturer's instructions when installing electrofusion saddles (from Plasson, Friatec, GF/Wavin) and Plasson mechanical saddles.